Planned Maintenance In Progress

Updated a few seconds ago

Description

DCX technical operations has issued an Emergency Maintenance Window to provide for the repair of the coolant systems on the generators systems serving DCX-GYR1 Data Suite 2. In certain operating conditions this could be service impacting.

Components

Critical Power, Critical Cooling, Internet Transit, Access Control

Locations

DCX-GYR1, DCX-GYR1-DS2

Schedule

August 18, 2023 12:01AM - September 18, 2023 12:01PM MST



January 9, 2024 12:54PM MST
[Update] Data Suite 2 generators have been repaired and are fully operational. Emergency generator has been removed. Repairs still outstanding for generators supporting Data Suite 1.

August 19, 2023 5:54PM MST
[Update] Temporary backup generation has been deployed.

August 18, 2023 12:59PM MST
[Update] Temporary backup generation is in the process of being delivered to DCX-GYR1.

August 18, 2023 8:37AM MST
[Update] DCX technical operations has issued an Emergency Maintenance Window to provide for the repair of the coolant systems on the generators systems serving DCX-GYR1 Data Suite 2. In certain operating conditions this could be service impacting.

Description

UPS2B requires service to the hydraulic lines. Service contractor has been notified. Arrival of technician is pending and status will be updated when technician is onsite. No impacts to critical power or cooling of DS-102 are expected or anticipated.

Components

Critical Power, Critical Cooling, Internet Transit, Dashboard, Access Control, Facility

Locations

DCX-GYR1, DCX-GYR1-DS1, DCX-GYR1-DS2, Global

Schedule

March 21, 2024 1:02PM - March 22, 2024 1:02PM MST



March 26, 2024 9:30AM MST
[Update] UPS2B vacuum pump disabled with Unit 1 in Bypass. Unit's 2 and 3 are 100% operational and protected. All critical systems 100% operational.

March 26, 2024 8:22AM MST
[Update] Single unit (1 of 3) requires new oil pump (current one needs replaced). Technician from Active Power is ordering the new pump for it overnight. Will place the unit in Bypass Mode so flywheel and vacuum system is not damaged. There is no expected impacts to critical power or critical cooling.

March 21, 2024 1:07PM MST
[Update] DCX technical operations has opened an Emergency Maintenance window effective immediately.

Description

Site improvements are in process and activity is taking place within the East Secured Yard where our Generators and UPS's are located. Any direct contact work with any critical power or critical cooling will be provided in it's own status update. This is an informational status posting.

Components

Critical Power, Critical Cooling, Internet Transit, Dashboard, Access Control, Facility

Locations

DCX-GYR1, DCX-GYR1-DS1, DCX-GYR1-DS2, Global

Schedule

March 21, 2024 2:14PM - April 5, 2024 5:00PM MST



March 21, 2024 3:18PM MST
[Update] Activities are underway. Vehicles will be located within the yard and contractors onsite.

Critical Power




Planned Maintenance

Critical Cooling




Planned Maintenance

Internet Transit




Planned Maintenance

Dashboard




Planned Maintenance

Access Control




Planned Maintenance

Facility




Planned Maintenance

2

Upcoming Maintenances

0

Incidents Last 30 Days

3

Maintenances Last 30 Days

External Services

Locations

Scheduled Maintenance

Schedule

April 1, 2024 9:00AM - 9:30AM MST

Components

Critical Power, Critical Cooling, Internet Transit, Dashboard, Access Control, Facility

Locations

DCX-GYR1, DCX-GYR1-DS1, DCX-GYR1-DS2, Global

Description

On Monday, April 1st we will be resetting the Operational Mode of each Data Suite in GYR1 to account for the seasonal temperature changes to the outside air. No downtime is expected.

Schedule

April 1, 2024 9:00AM - 12:00PM MST

Components

Critical Power, Critical Cooling, Internet Transit, Dashboard, Access Control, Facility

Locations

DCX-GYR1, DCX-GYR1-DS1, DCX-GYR1-DS2, Global

Description

An MOP will be executed on Monday, April 1st, 2024 to move a 400A breaker from UPS1B to UPS2B. This could impact critical power, internet connectivity and critical cooling although not expected to for a duration longer than 30 minutes. All electrical staff and operations personnel will be onsite for the duration and re-energizing of the equipment.

History

No incidents in the last 7 days